Showing posts with label paint. Show all posts
Showing posts with label paint. Show all posts

Friday, June 21, 2019

Overbooked? Making our Library Space 1F



The last three (3) weeks or so have been my deep, dark blue period, but only in terms of color, not mood. YEY! That started with getting the repaired and re-textured walls primed and painted a delicious indigo. It makes me so happy to see all those dark, deep walls. But I knew it would make me very unhappy if I had to break up the gorgeous sea of blue with white rectangles. And by white rectangles I mean standard switches, outlets, and the plates that cover them. So imagine my delight when I found them in a color called Rich Navy. And I do mean delight. I was actually delighted. This is exactly the kind of construction geekery that tickles my fancy. Oh, and they're almost matte, too. YES!

Just look at these sexy so-and-soes! Look how close they are to the dried paint in that tray! [swoons]

Sadly, I was unable to find such locally, but luckily, all but the dimmer switch arrived last Tuesday; just in time to get them installed after the painting, but before the plastering. Nice. And then because of the delay in finishing the plastering, the dimmer switch arrived before I could post this. WOO!

These are SO COOL! The front of them, the blue part, can be taken off and replaced with another color! There are about 20 colors; the Renu line by Leviton. 

Get a load of this! The front of them, the blue part, can be taken off and replaced with another color!  This is even the case with the outlets! There are about 20 colors to choose from in the Renu line by Leviton.

The wall in the photo is after one (1) pass with the Venetian plaster. I thought it looked like a half-healed road rash scab.

Now the bad news... the dimmer switch didn't work, like, at all. See the explanation here, first paragraph. I'm not going to type it all out, but I wills say there were some shipping snafus - the fault of the retailer, not the shipper - that delayed delivery to me first by one day and then by 3 more.

Before the whole thing with the dimmer was even a notion, I knew that they didn't make a phone jack. We've removed most of them from the house as we update rooms they are in, but I want to keep a couple, including this one. I found a Rustoleum spray paint that was pretty close, so I decided to spray the new one and also the heater control. Even though the finish is called satin, it was shinier than I liked, so I gave a quick coat of a matte varnish.



Getting those steps done got me pretty excited to get the Venetian plaster applied. After getting started, I realized that the quart of Modern Masters Venetian Plaster I bought was not going to be enough. So I hopped online to order another with free two-day shipping. Unfortunately, when it arrived on Memorial Day Weekend Saturday it had opened in transit and was unusable. Oddly, they wanted me to return it and it being a holiday weekend the two-day shipping means I couldn't expect it until the following Wednesday. And then it was delayed for an unknown number of days. Luckily, it arrived on Thursday - just one day late.

NOOOOOOOOOOOO!

Three more times I went through ordering a quart of this product, from two vendors. All three arrived open and spilled. They make clips that hold the lids on in transit! The two that arrived intact had those clips. I've seen them before... many times in my years as a decorative painter and even in the years since. Why those that sell these things via the interwebz don't get it, I do not know. I don't think I've ever had to wait 2+ weeks between second & third coats of a product! ARG! Finally the final quart arrived clipped and undamaged! Yey!


Two layers on the left, one layer on the right. Getting that second coat on a couple walls really helped me get some momentum after those frustrating setbacks. Taking this photo reminded me that I needed to figure out something for that central vacuum port that is not connected to a vacuum - once I figured out how detach it, I spray painted just like the new phone jack. 

This is a photo of the painted vacuum port. No really. It's that dark spot in the upper right. The center of the photo? Well, Delia has been camping out behind the door in the future library in the hot afternoons. On the dusty, crumbly floor. Also of note, the blue of the wall is in this photo is probably the closest accurate.

It took many hours over several days across multiple weeks to accomplish three (3) passes with the blue with the final pass lightly burnished, two (2) layers of clear topcoat with a few extra layers around the light switches, outlets, and that one outside corner. I am having a heckuva time getting a photo that accurately represents the color and texture/pattern. [shrugs]





This is the closet light switch, not the smart dimmer which was returned.




But hey, all that waiting for the freaking plaster to arrive intact, meant that the new dimmer switch  should have arrived before I was done! It would have been nice to get that installed before finishing the walls... in case I scratched it. Which I already had - in coat number two - when installing the smart switch that had to go back. But... no. No no nope-ity nope nope. Somehow Rejuvenation's online shopping cart accepted a PO box for a UPS Ground shipment. To make a long story short, this meant a package originally meant to arrive on Thursday midday would not be in my hot little hands until the following Monday late-afternoon. Or would it? I would not! Even though both the switch and the plate were supposedly shipped on the same day using the same tracking number... only the plate was shipped. Of course, I emailed as soon as I got the chance after realizing this and of course I got an email saying they they sure do love me and will certainly try their dang-darnedest to get back to me in two (2) days. I paraphrase, of course.

______________________________________________________________

THE BREAKDOWN

Phase I
1. Empty that room!
2. Remove base moulding
3. Remove closet doors & hardware
4. Remove the carpet and pad
5. Remove tack strips and staples
6. Remove chair rail and paneling
7. Determine if wall paper is removable
8. repair walls
9. prime walls and ceiling
10. paint walls and ceiling
11. decorative finish(es)?
12. replace light fixture (back-ordered, supposed to be available July 7)
13. replace switches and outlets, covers (waiting on that dimmer)
14, make and install closet shelves, etc. (will install the bottom shelf after the floors are installed)
15. prime existing subfloor x 2
16. pour self-leveling subfloor
17. install LVP
18. reinstall base moulding
19. reinstall closet doors
20. install transition piece at doorway
21. make window covering
22. install window covering

Phase II
1 - ?. Build built-in bookshelves
... Finish last course of flooring
... Add base shoe or other moulding to bookcases
... Add picture rail




Wednesday, June 12, 2019

Overbooked? Making our Library Space 1E



[Deep breath in]

My plan was that once the walls and ceiling were finally fixed and fancified and the outlets and switches replaced and plated, I would finally tackle the closet. But instead, I was waiting for what was supposed to be a 2-day delivery of more Venetian plaster, but was in fact a nearly 2-week delivery*. Also there was a snafu with the dimmer switch - oy. I had to switch gears entirely on that which bums me out, but that's the way these things go, I guess. You see, I had found and ordered these great switches and outlets which you will see in the next post. They blended right in with the indigo blue wall finish! The problem is that the dimmer switch was a "smart switch" which means it requires a neutral wire to function at all. Of course our 1976-built house isn't wired with those and the only solutions were either to have an electrician add one between the light and the switch or to find a "dumb" dimmer. I was not excited about spending what would probably be a couple hundred dollars just for this one wire. Eric is vehemently opposed to adding smart technology to the house, because personal security/privacy technology has not kept up with the smart technology.  Neither of us are having anything to do with any smart speakers, etc. so this made sense to me. I made sure that this product line did not include a non-smart dimmer (it did not), searched for another company that might have a similarly colored, non-smart dimmer (I found none), then decided to go a completely different way with the main light dimmer switch (but not the closet light switch or the outlets). My beautiful blue switch and its plate were returned and the Plan B switch and plate ordered (on sale!).

[Deep breath out]

So  decide to start on the closet while waiting on that. Even with all the disappointment and frustration of the dimmer switch debacle fresh and tender, it's still ridiculously satisfying to have this closet spruced up and made more suitable to our needs.

[Satisfied sigh]

Here is how the closet was when we moved in. Well, it came to us with doors, base moulding, and that carpet, but I removed all of those at the beginning of this project. They'll all get reinstalled after the floor goes in... except the carpet, of course.

[Shudders]

I consider us lucky that there are lights in the 2nd and 3rd bedroom closets. At least with this one, the switch is at or pretty close to standard height.

First, I took out the shelves and rods along with the hardware. Second, I repaired and painted the walls. Heck, I painted the ceiling, too.

Let's pretend there is a comma after "no" up there.

If you're wondering why the space outside the closet seems dark, it's because I did this work and took this photo before reinstalling the old main light switch, so the room itself was a little dim.

Third, I got new materials: brackets and shelving which I had cut to size at the store for the shelves on the right. The top shelf I custom cut myself. Then to the exposed cut areas I added the iron-on tape sold for this purpose. I determined that I could stall the top shelf a little higher if it was not the full 24" depth where it passed behind the door, because it would leave more space for fitting larger boxes and such. I didn't want to lose any storage space I didn't have to, so I decided to try this instead of just putting in a 12" shelf all the way across or trying to wrangle three different shelves at the same level.


After the floor is installed and the base moulding back up, I'll put in that last shelf.
MAXIMIZIN' THAT CUBIC AREA STORAGE LIKE A BOSS!

It would have been nice to be able to reuse the shelves that were in the closet as a start, but this is not for storing our clothing, it is for storing craft, art, and sewing supplies so I want to utilize every cubic inch that I can which means shelves the full depth of the closet. I did get to reuse the brackets that hold the closet rod and the rod itself.

A place to hang the big stencils, sewing projects, life-sized skeletons, etc. and to keep the wide rolls of upholstery and vinyl.
Of course what would have only taken a couple hours to accomplish actually took several days due to none of the 4 hardware/building materials retailers within 10 miles of here had particle board screws or anything with the appropriate threads in a short-enough length. Because apparently none of the professionally installed particle board shelving going into ALL the closets around here is installed using best practices. Annnnnd I imagine that's the case everywhere and it's just me being persnickety. I'm OK with that.



One last shelf will go in on the bottom right after the floor is done.

[Whoop]

Getting this part of the project checked off the list really helped the upstairs feel a bit more livable since many of the crafting materials that had been moved out of this room were stored on shelves that had been moved into the hallway. Ugh. We still have all the furniture and some of the stuff that will be stored in the closet stashed in places around the second floor, but this helps a little.

[Satisfied sigh]

*Emails have been sent, 1-star rating left**, product returned, refund issued.
** With specific, rational & non-ranty reasons described in review. Which is when the seller actually decided to respond. Too little, too [expletive] late, M_xW_rehouse.

______________________________________________________________

THE BREAKDOWN

Phase I
1. Empty that room!
2. Remove base moulding
3. Remove closet doors & hardware
4. Remove the carpet and pad
5. Remove tack strips and staples
6. Remove chair rail and paneling
7. Determine if wall paper is removable
8. repair walls
9. prime walls and ceiling
10. paint walls and ceiling
11. decorative finish(es)?
12. replace light fixture (back-ordered, supposed to be available July 7)
13. replace switches and outlets, covers (dimmer switch ordered, but not arrived)
14, make and install closet shelves, etc.
15. prime existing subfloor x 2
16. pour self-leveling subfloor
17. install LVP
18. reinstall base moulding
19. reinstall closet doors
20. install transition piece at doorway
21. make window covering
22. install window covering

Phase II
1 - ?. Build built-in bookshelves
... Finish last course of flooring
... Add base shoe or other moulding to bookcases
... picture rail




Wednesday, May 22, 2019

Overbooked? Making our Library Space 1D




I have been ogling indigo/brass/wood interiors for the last year or so. I thought it would be hard to sell Eric on this, but it was not. YEY! So, I dug out my paint decks* and narrowed my choices down over a few days while checking out how the samples looked at different times of day. The hardest part was choosing a ceiling color. I did not want white. I also did not want to just carry the wall color up onto the ceiling which is something I frequently do like. But then Eric bought new running shoes and guess what colors they are. Go on, guess. Yup, like navy blue, brass and a warm, light greige. Huh.

I do not have the skills to make an interesting photo of the ceiling and its decidedly not-white or ivory color, so here's this one.

Speaking of lacking photography skills, there is this photo of the walls. 

How about this pic, then? Nope, still no good, but I was excited enough about getting the color up that I took one.

These are a big commitment, so I decided to take advantage of the Benjamin Moore Sample Pints. Luckily, I loved them! They are 2061-20 Champion Cobalt and OC-27 Balboa Mist. Also. luckily my local Authorized Benjamin Moore Retailer sold me the tint for Champion Cobalt so I could mix some Venetian Plaster. WOO!




*This is not true! I had done this way before even mentioning this colorway to Eric. [wink]
______________________________________________________________

THE BREAKDOWN

Phase I
1. Empty that room!
2. Remove base moulding
3. Remove closet doors & hardware
4. Remove the carpet and pad
5. Remove tack strips and staples
6. Remove chair rail and paneling
7. Determine if wall paper is removable
8. repair walls
9. prime walls and ceiling
10. paint walls and ceiling
11. decorative finish(es)?
12. Replace light fixture (back-ordered, supposed to be available July 7)
13. Replace switches and outlets, covers
14, make and install closet shelves, etc.
15. prime existing subfloor x 2
16. pour self-leveling subfloor
17. install LVP
18. reinstall base moulding
19. reinstall closet doors
20. install transition piece at doorway
21. make window covering
22. install window covering

Phase II
1 - ?. Build built-in bookshelves
... Finish last course of flooring
... Add base shoe or other moulding to bookcases
... picture rail

Sunday, May 19, 2019

Overbooked? Making our Library Space 1C



I struggled to get excited about getting started with this room. I thought I'd start demo in February. And then we got DUMPED ON by the Snow Gods in Feb and I spent a goodly portion of many days dealing with snow removal, sometimes plowing & shoveling twice a day for at least an hour each time. I honestly don't remember exactly when I really got started emptying the room, but it was probably near the end or March or beginning of April. For some reason, I didn't remember that once I got past the Undoing Phase and onto the Doing Phases, I would feel that old enthusiasm. Or at least some of it. Sigh.

You may notice a slight difference in color on the left and right. The left is the still-wet second layer of skim coat, the right is the dry first layer. My trusty hawk and trowel sit on my trusty step stool.

Since my last post, I have A) primed the seriously damaged drywall substrate I was left with after removing wallpaper and fake paneling (no photo), B) skim-coated the appropriate walls, and C) primed those walls, and D) primed and painted the ceiling.

Paint this knock-down (i.e. "brocade") textured ceiling is a humongous pain in the butt. Even with the long-nap roller, the priming, the slow and tedious attention to every stroke the first coat was riddled with holidays. Brining in the halogen work light helped a lot with the second coat, but boy did this whole thing go a long way to supporting my personal distaste of this texture.

I know most people love light-and-bright, but dark-and-cozy is my jam, so it was a little it of a thrill to get this darker grey primer up in preparation for the dark, indigo blue.

I have also ordered some Modern Masters brand (acrylic) Venetian Plaster in the Ultra Deep Tint Base, and picked up sample pints/quarts of paint to give the colors a test run, then gone back to purchase a gallon of each. I also did a test tinting of the Venetian Plaster with tint purchased when I picked up the gallons.



______________________________________________________________

THE BREAKDOWN

Phase I
1. Empty that room!
2. Remove base moulding
3. Remove closet doors & hardware
4. Remove the carpet and pad
5. Remove tack strips and staples
6. Remove chair rail and paneling
7. Determine if wall paper is removable
8. repair walls
9. prime walls and ceiling
10. paint walls and ceiling
11. decorative finish(es)?
12. Replace light fixture
13. Replace switches and outlets, covers
14, make and install closet shelves, etc.
15. prime existing subfloor x 2
16. pour self-leveling subfloor
17. install LVP
18. reinstall base moulding
19. reinstall closet doors
20. install transition piece at doorway
21. make window covering
22. install window covering

Phase II
1 - ?. Build built-in bookshelves
... Finish last course of flooring
... Add base shoe or other moulding
... Add picture rail moulding

Thursday, May 9, 2019

Overbooked? Making our Library Space 1B



Demo is mostly accomplished! Tearing out the carpet and pad were the least of the issues. All that kneeling and crouching wasn't super comfortable, but that part of the demolition was straightforward and surprise-free. I realized after the fact that I don't think I took a photo of just the carpet, but this one gives you the idea; dingy tan shag with really obvious seams.





What you see sitting on the carpet is a piece of the fake paneling, some of the base moulding, a piece of the plastic moulding that went with the paneling, and the end of a piece of the chair rail. Speaking of all that, look what that paneling did to the wall! Why? Well, instead of using panel nails, they used panel adhesive. I realize that's probably standard, but I sure wish more people in the industry on all sides would consider more carefully the un-doing of their products when designing and executing their installation methods. This is what "the next guy", me in this case, is left to deal with.



I'm just trying to remember to be grateful that they paneled not quite half the room and only to chair rail height. There is at least a sheet of this stored in the shop loft, so it really couldn't been worse.


ANNOUNCEMENT: 

THERE IS A REASON THERE IS A DRYWALL TEXTURE SPECIFICALLY FOR APPLYING WALLPAPER! 



Anyway... the wallpaper. Oh, sweet baby Bigfoot, the wallpaper! The steamer could not handle the painted-over-ness of it. This method has worked for me in the past, but not this time. Sigh. And indeed, just like every single other roll of the stuff in this house, it was applied directly to the drywall which at least this time seems to have been primed. Still, this is what removing it did. Those dark spots are the torn drywall paper bits. Admittedly, this is the worst of it as I got better at finessing it off as I continued around the room.



BONUS BITCHING! During all of the various projects we've done around here over six-and-a-half years, there have been a few, repeated, uh..., issues that indicate that whoever did the drywall here, was not an expert. Or even really especially competent. The first thing we noticed, and by far the most common issue, is that just about every single hole for the electric boxes - switches, outlets, and fixtures - is cut too large. This means that the outlets are not secure and that some plates and most of the light fixtures we've bought to replace the old, dated ones do not cover the holes. I'll replace the outlets and switches to fix these. I've had to add small medallions on three ceiling fixtures in the house so far and hope that I won't have to do another.

But that's not what I want to show now. What I want to show now are these examples of what I'm starting to think of as Bullshit Workmanship.



Yes, that's the same image as the first in this post. Apparently there was some kind of significant savings in time or money to not finish the corners behind the chair rail. Oh, and this. This part where they didn't think that the whole surface above the closet opening needed drywall, just allllmost all of it. It's not just this little bit either, it's all along that top edge.


______________________________________________________________

THE BREAKDOWN

Phase I
1. Empty that room!
2. Remove base moulding
3. Remove closet doors & hardware
4. Remove the carpet and pad
5. Remove tack strips and staples
6. Remove chair rail and paneling
7. Determine if wall paper is removable
8. repair walls
9. prime walls and ceiling
10. paint walls and ceiling
11. decorative finish(es)?
12. Replace light fixture
13. Replace switches and outlets, covers
14, make and install closet shelves, etc.
15. prime existing subfloor x 2
16. pour self-leveling subfloor
17. install LVP
18. reinstall base moulding
19. reinstall closet doors
20. install transition piece at doorway
21. make window covering
22. install window covering

Phase II
1 - ?. Build built-in bookshelves
... Finish last course of flooring
... Add base shoe or other moulding

Monday, May 6, 2019

Overbooked? Making our Library Space 1A



I had a lot of books. Eric really had A LOT of books. Together we have SO MANY BOOKS and we've only acquired more. But as everyone knows, it's not hoarding if it's books. YEY! It's not really a surprise that when we left all those Craftsman built-ins in Portland, we lost a lot of book storage. Even though all our books are out of boxes and most of them are on shelves that are not in closets, the storage is unsatisfactory and makes the craft studio/library/auxiliary guest room layout unsatisfying. And since we (well I mostly, let's be candid) need to entirely empty the craft studio/library/auxiliary guest room in order to rip out the carpet and to install the new flooring, it seemed like the perfect time to figure out every other surface in there as well as address the book shelving situation.

I forgot to get a photo before I was well into the process. This big shelf was FULL of books on both sides and full on top.

These 24 boxes are tightly packed with all (well most) of those books! They will stay right there until most of the remodeling is done since that wall is where the new bookcases will be installed.

In addition to the carpet and the bookshelves, there are a few other issues. The dreaded painted-over wallpaper for one. If that wallpaper was put in by the original owners, then it is very likely glued directly to the drywall and will have to be skimmed over. If not, there's hope it can come down with my trusty (slightly crusty) steamer.

What is even under there? Did they throw dirt at the wall while putting up the paper?

There are also some seemingly random applications of that faux paneling popular in the 1970s when the house was built. This stuff could very well be glued to the drywall, too. Which could mean lots of repairs. I do believe there is a full or nearly full 4' x 8' sheet of this stored in the shop loft, too.

My guess is that the paneling was an afterthought, because of the extra mouldings applied above the base and below the chair rail.




The dinginess of the photo quality here betrays the feeling the finishes give the room. 

And to complete the wall renovation triple threat, a chair rail that goes all the way around. It was also painted over when the wallpaper was, so it's going to require some extra work to get off and also not be especially appealing to reuse in the future.

I don't know what the original look was, but it seems like when they decided to paint over the wallpaper they just pained painted over everything that wasn't fake paneling, including the chair rail.


Just as with the guest room, this seems like the perfect time to improve the storage capabilities of the closet as well as repaint in there. (no photo) In fact, I'll have to repaint the whole room and perhaps utilize my old decorative painting skills. [wildly waggles eyebrows]

I actually find both the ceramic base and the glass globe charming, but less so together. It's also inadequate in terms of both providing light as well as for scale. It's a very small light in a rather large room. Each of the pieces may find their way to other spots in the house.

And finally, we want to change out the central ceiling light fixture - hopefully with something that could give us more light around the room, which is actually quite large for a 2nd bedroom in a house this size. Which means installing a dimmer and while I'm at it I may as well update all the outlets and the closet light switch, too.

______________________________________________________________

THE BREAKDOWN

Phase I
1. Empty that room!
2. Remove base moulding
3. Remove closet doors & hardware
4. Remove the carpet and pad
5. Remove tack strips and staples
6. Remove chair rail and paneling
7. Determine if wall paper is removeable
8. repair walls
9. prime walls and ceiling
10. paint walls and ceiling
11. decorative finish(es)?
12. Replace light fixture
13. Replace switches and outlets, covers
14, make and install closet shelves, etc.
15. prime exisiting subfloor x 2
16. pour self-leveing subfloor
17. install LVP
18. reinstall base moulding
19. reinstall closet doors
20. install transition piece at doorway
21. make window covering
22. install window covering

Phase II
1 - ?. Build built-in bookshelves
... Finish last course of flooring
... Add base shoe or other moulding

Wednesday, October 31, 2018

Let's Potty! Part II - A Water Closet Renovation



As home remodeling projects tend to go, this one ran into some obstacles which made it take a bit longer. The biggest obstacle was simply that we ended up having to order our new toilet, because they were out of stock. Luckily, they had some coming and we got our name on one! Yeah... we're considering ourselves lucky to have our name on a toilet. Phases A-E are here. Below are the long-winded phases!

Phase F: Install new, modern, low-flow toilet

I forget about good ol' WD-40, so was mentally preparing myself to have to take a hacksaw to the various metal bolts holding all the parts of the old toilet together. Pulling the old beast (tank dated: August 14, 1977, so still younger'n both of us) out of that tiny room was still a hassle, but less of a hassle than feared.



You know you're a reeeeeally grown up grown-up of a certain stripe when things like fancy toilets and endless storage space with thoughtful design are part of your lottery-winner fantasies. This toilet is not fancy, but was rated highly-enough and the price was right. In fact, simply by pulling the old toilet out myself, I probably saved the cost of the new toilet! And by installing that myself, I saved the cost of disposing of the old one and buying a new flange... plus some. So this is essentially a free new toilet! Or something.

We picked up a new trash can - one with a lid, because a certain member of our family likes to eat things out of the trash can. I'll let you determine which one of us that is. Ahem. Not sure we'll be keeping the rug-thingie. This is the only toilet in my life that has ever had one and I'm not convinced I want one. It's hardly been used and it seems like a thing no one is going to want to buy used, so the idea of generating waste by not keeping it is bothersome. Yeah, I'm that person.

Bummer: I ordered the toilet on August 8 with a pick-up date of August 24. When I didn't hear from them on the 24th, I called on the 25th. They had no real idea when to expect it, but since it was a stock item they guessed August 31st of September 3rd. I got the call on               . I called again on September 5, and was told it was there! This situation was more frustrating than I expected it would be,  because having any clean running water with indoor toilets is pretty great and we have two even without this one.

Phase G: (Reprise): Install that TP holder... with a modification.

I had to move the holder to the far right of the crate to make room to replace the roll, because the whole kit and kaboodle needed to be installed closer to the door than I expected.


Phase H: Refinish and hang cabinet for TP or make/buy holder-storage combo.



So, I decided that I needed to go with the make/buy option... which became the make option.

The toilet is not centered, so I had to decide how to hang the cabinet: centered over the toilet or centered on the wall. The difference between the center marks was about an inch and I roughly split the difference.


I've already been down the special-toilet-paper-for-a-particular-bathroom-due-to-storage road and I am over that crap. (heh)



It is a bummer not getting to reuse that perfectly serviceable cabinet and that the TP holder wasn't going to do. I donated both pieces to the local used building materials warehouse. I did look there for replacements for both of these pieces, but had no luck. All this means that I ended up making a little cabinet! I had purchased a pair of these little bi-fold doors at a thrift store years ago and am glad to finally actually use at least half of them. The wood* for the carcass came from shelves we removed from the master bedroom shortly after moving in. I was also able to use stash for the shelves, shelf pegs, and paint. And the knob is an antique door knob we brought with us that had been in Eric's basement in the old 1911 Craftsman in Portland! I did buy the plywood for the backing, new hinges, and some supplies to make the doorknob into a cabinet knob.



Another bummer: So. The carcass. Well, I hadn't remembered we had those 1x8s stored in the rafters of the shop and when I was shopping I decided to save on budget and buy some MDF. Well. Sigh. Let's just say that didn't work out for me. The bummer is exacerbated by the fact that scraps of MDF 1x6 and 1x8 aren't nearly so useful as "real" lumber. The bummers just keep coming: the door was too heavy for the hinges I bought, which were pretty much the same as the hinges that had been on it if the "scars" were any indication. So I ended up buying continuous (i.e. piano) hinges. And then procrastinated installing them, because I was scared that they also would work, but they did!


Part III:
Handmade & vintage decorations!