Showing posts with label faux bois. Show all posts
Showing posts with label faux bois. Show all posts

Monday, July 15, 2019

Adventures in DIY Flooring - Cutting the Rug VIII



If you have been popping in to check on things here, you know that I've been focusing on remodeling our library/studio/auxiliary guest room. That room was the last of the carpet and I decided that while the room was completely empty and before the new floor was installed I would take care of all the other issues and start turning this room more officially into a capital-L Library*:
When those were done, I finally tackled the floor! I forgot to take photos of the carpet specifically, but here it is with removed wainscot and chair rail on it. Ick.


I decided to forego all the in-progress shots, since you can see those in the other Adventures in DIY Flooring posts should you choose. But know that Eric again helped with installing the self-leveling underlayment - it would havbe been brutal without him. After that I spent a few hours over three days doing some patching and then it took me three short-ish days to get the LVP laid down.

Almost halfway! Somewhere around 40% done I cut a chunk off the end of my left index finger, so that was... eventful.
And the floors are done! Well, except that last bit that will abut the bookcases when that gets done.
This photo has the more accurate floor colors.

Then I tidied up the base moulding and reinstalled most of it. I want to build bookshelves across that entire unfinished wall this autumn, so am leaving the base moulding off there. I think we'll replace the baseboard heater then, too, so that piece is staying off, too. I had assumed baseboard heaters would cost a couple hundred bucks, so never considered replacing an of ours which are in pretty sorry shape, but that we hardly ever use. Their paint is worn and scratched, as well as speckled with paint and stain from all the years the other owners have painted and stained. But it turns out that new ones are not even one-hundred dollars! It also turns out that the electrician that the home warranty insurance had come out to replace the once in the living room our first year here, was a liar as well as a flake. He said they didn't make them as long as the one he was replacing any more, but Lowe's has them in stock right now. Maybe they didn't make them 6 years ago, but I have very serious doubts. Anyway, I can see replacing most of them over the next few years and updating the controls while we're at it. 



In addition to the wall o' books, this room will also be getting new window coverings and a picture rail. I will still use it for sewing and crafting until we can kit out the shop as a studio, but am dedicated to really trying to keep it tidy and contained. Eventually we'd like to move the TV out of the living room, have comfortable watching reading furniture in here, as well as some kind of portable/fold-away desk for Eric to write at. We need to get this room's current furnishings out of the guest room and hallway, as we're expecting some guests over the next few months, so it's going to be awhile before this room is "done."

Where the bookcases will be!



*I've been calling that series "Overbooked?" because... we have A LOT OF BOOKS in addition to the books on the shelves that came with the guest room and on the shelves I added in the guest room closet.



I have forgotten and procrastinated on ordering another transition piece for the doorway, so there is that to finish, too. It didn't take too long to get it last time; I hope to pop in there to order it soon as well as return three (3) unopened boxes of the LVP. I will keep 2+ boxes for repairs and whatnot.




Monday, July 1, 2019

Adventures in DIY Flooring - Cutting the Rug VII



I took a bit of a breather before tackling the last room - like several months, but before that there was this one last little bit to share: the "transition pieces."

I'm used two kinds; a T-mold and a stair nose. The T-mold was installed in October and is in the door ways and was not a requirement of the material... COOL FACT: this VPL can cover floors up to 300 feet long without requiring transition pieces. NOT-COOL TARA: I just couldn't empty the entire upstairs all at once and/or do all the math with the separate rooms and the not-perfectly-square rooms to manage to do it all without breaks. I'd rather that we didn't have to have the transitions in the doorways, but...

Two of the three that are completed so far. Visually, it's really subtle where it follows the same direction as the planks and it's not egregiously noticeable where it crosses the planks. Their overall profile is shallower than many of these kinds of transition pieces for other types of flooring.


The stair nose is tricky, because of the self-leveling underlayment and issues with the way the top stair riser was... let's call it "slightly janky," and the way the original underlayment was... let's say "slightly janky."



So I got this far (see below) and then it has stayed that way for... months. Not twelve months, but quite a few. In fact it is that way now, because there is always something less scary to work on. You see, I still need to build up that edge. I didn't realize I'd need to make up for the self-leveling underlayment, etc. D'oh!




I know these little threshold bits are boring. I also know that it was a bit nerve racking to install because a not-quite-eight-foot-length of each of these things were kind of spendy and I didn't want to mess them up. So, I had to share my success! And also share my super technical technique using super specialized special tools for holding the pieces in place while the adhesive dried.



Cast iron cookware: is there nothing it can't do?




Unforeseen additional steps:

I had to pull up and reinstall the planks in the hall and guestroom. Ugh and oof. While I did follow directions very closely from the very beginning when installing the LVP , I didn't quite get it right. There were some joins that I didn't notice hadn't quite clicked together until I was "done" which I thought felt was noticeable underfoot and looked so, too. I assumed this would also effect the longevity of the floor. Because I was very careful when pulling the planks up and stacked them in order course-by-course, I was able to reuse the same pieces with just just a few exceptions. It went A LOT faster since pretty much all the cutting was already done. Sure, it was a drag to have to empty the rooms of furniture, clear the closet floor, and pull up all the base mouldings, but I think it was worth it and I'm glad I (re)did it. I'm also glad I noticed before I started the master suite and bathroom so I could get it right from there and I'm really glad it's over.

Yeah, yeah. They're called "cups," but they're a lot more like a coaster as far as I'm concerned, so that's what I'm going to call them.

When I was pulling up the planks in the guest room I noticed that the bed feet had dented the surface. As per manufacturer instructions, I had added felt feet, but that only protected the surface from scratch-type wear, not dents. So, I picked up coasters for the bed feet. These are the kind made for carpet - they have a felt-like/fabric surface against the floor. The LVP manufacturer also recommends against rubber backed rugs and rubber rug pads, so I have to assume the rubber-bottomed coasters meant for hard surface flooring would not be recommended either. Hopefully, by avoiding running and throwing ourselves onto the guest bed we can keep it from sliding around too much! The master bed frame already has broad feet to distribute the weight better - and 6 of them at that.



Monday, April 9, 2018

Adventures in DIY Flooring - Cutting the Rug II



Here we go! As mentioned in Cutting the Rug I, I'm going to start installing the new flooring in the guest room, working west through the hallway and into the master bedroom.



I'd already removed the carpet, pad, and staples in the master bedroom, so I just continued with the other two rooms. Given that there really is no place to move the entire contents of all of these rooms all at once, this is where it started getting difficult.

Temperature non-sensitive stuff sometimes in moisture resistant containers was stored on the balcony... and of course is snowed a bit and despite typical snow behavoir it actually settled all the way to the siding (but had melted by the time I took the photo).

But guess what? We noticed the smoke smell might have actually stronger after the master bedroom was down to the subfloor. UGH! So I did some more research and decided it was probably coming form the subfloor and that there were a couple ways to handle that. The way I chose was to seal the subfloor with a shellac-based primer, like I'd used before when working on a couple fire-restoration jobs back in my decorative painting contractor days. I also used this stuff to paint a closet that reeked of cigarette smoke in a rental I lived in once and it worked great.

When I tore out the carpet from the master bedroom, I didn't have any trouble with the baseboard heater, but the guest room heater had to come off the wall to get to the tack strip. Sigh. So I have started a list of unexpected, added steps. See below.
Fun Fact: we haven't turned on either heater in years. Good to have as backup, I suppose.




I wear a respirator and this primer cures, via evaporation, very quickly. So, it turns out getting this going in spring worked out so I could air each room out pretty quickly with a fan in the window while Delia was outside keeping the Squirrel Menace at bay.

All the blue carpet is oh-ewe-tee OUT!




Speaking of unforeseen steps... and now we wait. Wait for the vendor to get back to me with some details and wait longer, up to 3 weeks) if those details are a particular of one of the options. Sigh.

_______________________________________________________



Number of Evil Tack Strip stabs: 6 (see photo, above)
Number of times I've taken breaks to comfort Delia after vacuuming: 2
Unforeseen additional steps:
     Removing baseboards (that was just willful naivete)
     Touching up wall paint where reinstalled baseboards might be lower than prior
     Removing on baseboard heater to pull tack strip: master, no; guest, yes
     Might as well install closet shelves, etc while we've got them emptied. Painted, too.
     Taking down closet doors and popping room doors off their hinges
     Figuring out how to reinstall bi-fold doors now that the floor is lower
     Removing glued-down vinyl flooring under existing laminate in bathroom.






Thursday, April 5, 2018

Adventures in DIY Flooring - Cutting The Rug I



And now this year's (first?) big house project: replacing that blue carpet we hate so much! The color and wear of the stuff is only part of it. I mean, if this was installed back when this color was popular, it is 30 years old give or take. It's done its job and then some. And by "and then some" I mean that it's done its job and also absorbed some odors including the slightest aroma of cooking oil and cigarette smoke. Like we can't always smell them, but then when we do catch a whiff it sticks with us. Blech. In the main traffic areas the pad is shot, too.

I started the demo in the master bedroom. After getting all the carpet, pad, & staples out of this section, we moved all the furniture back and upended the bed to get that side.

Demo can be very fun in a cathartic kind of way, but tearing out wall-to-wall carpet is not fun in any kind of way. Poor Delia; between all the vacuum-monster sounds and the mama cussing sounds she didn't find it fun, either. She had to come give my neck and ears a very good cleaning while I was sitting on the cedar closet floor with her ears in the worried position the whole time.

Is the photo blurry or is it just air born particulates making it look that way? So much dirt and dust under the carpet pad! And it was so obvious where main walking paths were vs. where furniture was. GAK! Yes, I wore a mask.

We - more Eric than I - just finally could not take it any more. I didn't think we were ready to financially commit to replacing pretty much 800+ square feet of carpet, so I re-visited the projects I'd seen online where people painted and stenciled their subfloor. They could look very nice and not at all like half-arsed solutions. And then I looked into the possibility of DIY carpet binding which actually seemed pretty feasible. Until I priced broadloom carpet remnants, that is. Even the most generic of greige options were pretty costly! In fact, all the options were just variations on generic greige.



The left side (also the back side) is all master bedroom/closet/half-bath. Center is full-bath and hall. Right is guest bedroom and studio/office/sewing room/auxiliary guest room.

So then we decided that if we were going to spend that kind of money for painting and self-bound, boring rugs we should at least look at what the materials would cost to replace the flooring "for real." That's when I drew up that layout on graph paper to email to Doug at the flooring place. I get teased for my proclivity for drawing rooms - and their furnishings - on graph paper, but it works for me and I actually enjoy doing it, so... suck it, haters!

This is the carpet and pad from only the master suite. Without working the numbers, I think it's safe to say that the master suite comprises at least half the blue carpet, though. It is a good thing we started this mess when the wood shed was almost empty!

Just doing the quickest of estimated calculations, I determined that going with Plan A - the filling, priming, painting, stenciling, & sealing and then DIY binding rugs to size could easily cost $1500. It would be dirty work that would take a long, long time with much of that time crawling around on the hard floor. It turns out that was more than half the cost of the materials for installing plank vinyl. This stuff is rated for sound-proofing for multifamily dwellings as well as being waterproof due the core not being made of wood particles. This also means that it has a much greater span capability so there's no need to have transition pieces in doorways, etc. I think it's a fair assumption that this is going to be much faster and easier, as well as a cleaner project and more likely to last as long as we do. 

There were six to choose from at the cost we were quoted. The other three were a narrow plank pattern, so I didn't even bring them home as I knew they weren't right for us. From these three, we both liked A best on its own. However, A was pretty much the one that worked the least with all the other wood tones going on. Both B & C would work, but we like the "saw mark" stuff going on with C and the oakiness better for our house in the forest.

I think I'll start in the guest room, move through the hall to our bedroom/closet/half-bath. After those, I'll likely tackle the bathroom which has the more typical laminate, probably installed shortly before the last owners put the house on the market. Last will be the office/studio/sewing room/auxiliary guest room, which actually has light beige carpet of a similar era instead of the blue and also has the most shit stuff to move. It's also the only room upstairs other than the hall that we haven't repainted and it has some unfortunate fake paneling wainscot in a few, random places along with a mystery chair rail all the way around. I've already started playing around with how we might put the room back together when that's done... probably sometime next winter.

You can sure see the difference between this photo of the graph paper studio and the scan of the graph paper second floor.





Tuesday, February 6, 2018

Light Control



In an effort to further update the guest room, I've made a few more things.

1.

An accent lamp.



That's right another vintage thermos lamp and I used the same tutorial linked in the first post. This thermos was the first acquired specifically for lamp-ifying and I finally came up with a suitable lampshade idea for it, so finally made it.



This time I painted the hardware, "flat black." Hmmmm. Well, the only way this paint would be flat is I'd painted a pancake! This did not do what it says on the tin. Oh, well.




This is a plain, chandelier shade from Lowe's, covered with fabric recently added to my stash - ahem - and trimmed out with black twill tape.



2. 

Replaced the ceiling fixture with a repainted fixture.



Originally I thought I'd paint the existing bright brass builders' boob light (BBL) that was in there when we moved in. Then it occurred to me that we have a small stash of fixtures we'd taken out and stored in the shop with the intent to donate them and that I should have a look to see if there was something suitable that would be better than a repainted BBL. And I think there was!

From before the 2016 kitchen remodel started.

I think of this as 1970s (and earlier?) version of the cheap, utility light and it came out of the kitchen. I never liked it in there, but always found it more charming than a BBL... at least it looks vintage. So I decided to clean it up and give it a quick paint job: both the chrome base and the glass globe.



Of course, within the 40 years I assume that thing was up it had gotten paint on it from sloppy ceiling painters. Luckily, it was all latex paint and came off pretty easy with rubbing alcohol and a little attention from a razor blade. After some simple, but thorough, masking, I painted it in the woodshed and hung it to dry in the bathroom (door shut, heat & fan on).



The globe has a little paint and some dust, so I cleaned it up and did two quick pinstripes on the side. Inspired by the schoolhouse look, even if not really replicating it because of the different style.



I bet you can guess what's coming up next just by looking at this next photo. It ends with "t" and starts with pain. That's right... PAINT!



Question: Does the angle of this photo make the ceiling fixture look off-center?
Answer: No. The ceiling fixture being WAY off-center makes the ceiling fixture look off-center.

I used the same two 60-watt-equivelent LED light bulbs that came out of the boob light in the "new" light and it's so much brighter! Just goes to show you how much the fixture can matter.
_________________________________________________

Our supplies stashes were integral in these projects, but perhaps a little less so than the shelf backers. 

    OUT OF POCKET COSTS:
    LAMP
      $  5.98 - lamp shade
      $  2.39 - twill tape
      $  6.49 - bottle lamp kit
      $  0.49 - rubber grommet
      $15.35




Tuesday, May 3, 2016

One Step at a Time: Kitchen Edition, It Does Go On, Doesn't It?

The last little fiddly bits seem like they take ages, especially when they are parts of different projects within the project. And then the fact that we keep adding "little" projects makes it seem like we've ages to go.

Two weeks ago.

Four weeks ago and now that the original list is longer, probably not halfway. Oof.





1. Installing the backsplash.



I picked up brown caulk and installed it on Wednesday. This completes number 9 on the original list (below). HOT DAMN!




2. Refinishing the cabinets.

The last pieces of the carcass were varnished early in the week! To celebrate, I put up some decor using the picture rail hooks and cord. It was unduly exciting to get Dale the Jackalope back in his rightful place and joined by my cool new birthday resin antlers!



I admit, it's a little bit of a thrill to put to use my idea of using picture rail to add a crown to the upper cabinets. And a little bit of a thrill to get out and use the particular picture rail hooks I found which are just right.



The last four doors, all for the corner pantry, are done and ready to go up when the dagburn hinge screws get here. I do not believe it is the fault of my local lumber yard that this has taken so long, but I do wonder how the ever-loving hell a hardware distributor can not just freaking distribute hardware. Hardware that has specifically been requested. The rep doesn't even have to come out to get the commission - it's been called in. Why do they not want easy money?

No, this does not mean that my hinge screws came it. It means that the little doors above the fridge and microwave are being held temporarily in place by the magnetic closures.
You can see I've removed the faux bois "skin" and the handles on the fridge in preparation for #12 on the original list (below).

The last four drawers are well on their way and the interior of the corner pantry is next up. I am not looking forward to emptying it and stashing dry good in boxes that we'll have to keep dogs from sniffing around. But I am looking forward to being able to see better inside the pantry and all the other cabinets are now better organized just from having taken things out and put them back in, so hopefully that'll happen with this one, too.

3. Doing something to that terrible brick veneer wood stove surround.



First, the wood rail at the top came off. We'll replace it with something a little more finished-looking and level. Not only were the lag screws drilled at varying distances from the center of the shelf, they were lag screws used for finish carpentry AND it seems whoever installed them was making up for the way-too-short screws that "held up" a couple of the upper cabinets. These suckers practically went into the laundry room on the other side of that wall!

Note that whoever installed this little shelf/cap didn't even make a fresh cut to get rid of the mill stamp on the end of the lumber, let alone sand it at all.

Second, reattaching the loose "bricks" and re "mortaring" the loose or missing "mortar." The last owners seemed to think that the "mortar" around the "bricks" is what attached them to the wall so to "fix" loose "bricks" they just added more caulk tube mortar. So yeah. At some point in the next few years we're hoping to replace our wood stove with something slightly smaller, with a window in the door and a built-in fan. At that point, we'll redesign the whole hearth area and hopefully use something less textured - i.e. less dust collecting - probably some kind of slab material



Third, make a sample to determine how exactly I'm going to make these red bricks look like some not-red bricks that I found online and pinned on my "Homefront: Kitchen Revamp" pinboard. But that'll be next week.

EXTENUATING CIRCUMSTANCES

When searching for something else related to wood stoves online, I happened upon stove paint - not the appliance paint you get at the home center or hardware store - and now we're thinking we want to paint the wood stove. After reading the instructions for the paint, I am thinking that I need to do that before I refinish the bricks. Sigh.

B. Unrelated to the kitchen project.




The mass in Betty's chest had not diminished after 3 weeks of chemotherapy. This was a likely outcome, because the tumor is benign and therefore slow-growing. So we are discontinuing chemotherapy. Because the fluid has stayed off, we are continuing with the prednisone and in two weeks she'll get another sonogram to see if the fluid is kept off by the prednisone.

She seems to be feeling pretty well. Other than some side effects of the prednisone and the occasional slightly-to-moderately labored breathing, she is acting pretty normally - just a smidgen more leisurely.




The original list of the order I thought the projects will happen. Line through for complete items, italics for additions. I'll let myself do partial line throughs for partial completion, because it's good for my morale.

1. Light fixtures
2. Remove corner shelf in order to...
3. Remove wallpaper and repair walls (& ceiling) as necessary, get temp solution for backsplash
4. Paint walls above cabinets, around wood stove, paint laundry/bath hallway.
5. Cabinet repair, move, modify
6. Refinish cabinets
8. Level, repair, and refinish counter tops
11. New sink and faucet and the counter modifications that go with it.
10. Replace outlets, switches, plates in backsplash.
9. Install backsplash, probably tile
7. Maybe try to do something with that terrible brick veneer wood stove surround?
12. New refrigerator surface to replace old new refrigerator surface.
13. Build a door of some sort for that too-big hole for the microwave & deal with the inside.
14. Replace outlets, switches, plates by wood stove.
15. Paint wood stove and stovepipe.